Stormwater compliance

SWPPP Services for California Construction Sites and Industrial Facilities

SWPPP development, updates, inspections and SMARTS filings by certified stormwater staff, so your plan stays current and your site stays covered.

Water surging out of a street drain during a storm event

What we do

SWPPP services, from first draft to annual report

A SWPPP only protects you if the site follows it and the records prove it. We handle the plan and the work that keeps it true.

  • SWPPP development

    A site-specific Stormwater Pollution Prevention Plan prepared by our certified stormwater staff for a construction project or industrial facility.

  • SWPPP updates and amendments

    Revisions when site conditions, operations or the permit change, certified and submitted in SMARTS inside the permit’s time limits.

  • Permit Registration Documents

    The Notice of Intent, site maps and supporting documents filed in SMARTS so your site receives its WDID number.

  • SWPPP inspections

    Weekly and storm-event inspections on construction sites, and monthly visual observations at industrial facilities, each one documented.

  • Sampling coordination

    Storm sampling scheduled against the forecast and the permit’s requirements, with results submitted in SMARTS.

  • Annual reports

    Annual reports prepared and filed in SMARTS by July 15 for industrial facilities and September 1 for construction sites.

Permits

SWPPP requirements by permit

California’s two statewide general permits treat the SWPPP differently.

RequirementConstruction (Order 2022-0057-DWQ)Industrial (Order 2014-0057-DWQ)
Who needs oneSoil disturbance of one acre or more, or less within a larger common plan of development of one acre or moreIndustrial activity in a category listed in Attachment A, by SIC code
Who prepares itA Qualified SWPPP Developer (QSD)The discharger; a QISP is required once a facility enters Level 1 status
Field workA Qualified SWPPP Practitioner (QSP) carries it out and inspectsThe facility, with a QISP for Exceedance Response Actions
When to enrollPermit Registration Documents in SMARTS before construction startsPermit Registration Documents in SMARTS at least 7 days before industrial activity starts
Updating the planSWPPP amendments within 30 calendar daysSignificant revisions certified in SMARTS within 30 days
Annual reportSeptember 1July 15

Risk levels, sampling and every deadline: SWPPP requirements in California.

Inspections

SWPPP inspection schedule

Requirements from CGP Attachment D, Section III.C and IGP Section XI.A. Your Risk Level and local permits can add to these.

InspectionWhat the permit requires
Weekly BMP inspectionEvery construction site. A storm-related inspection also counts as the weekly inspection.
Before a stormA QSP inspects within 72 hours before a forecast with a 50 percent or greater chance of 0.5 inches or more in 24 hours.
During a stormAt least once every 24 hours during a Qualifying Precipitation Event.
After a stormWithin 96 hours after an event if the on-site rain gauge measured 0.5 inches or more.
Industrial visual observationsAt least once per calendar month in each drainage area, in daylight and during operating hours.

The process

How it works

  1. Tell us your site and permit
  2. We confirm coverage and scope
  3. We prepare or update the SWPPP
  4. We file in SMARTS
  5. Inspections and reports stay on schedule

FAQ

Questions about SWPPP services

Who needs a SWPPP in California?

Construction projects that disturb one acre or more, or less if part of a larger common plan of development of one acre or more, need a SWPPP under the Construction General Permit. Industrial facilities in the categories listed by SIC code need one under the Industrial General Permit.

Who can write a SWPPP for a construction site?

Under the Construction General Permit, the SWPPP is prepared by a Qualified SWPPP Developer (QSD) and carried out in the field by a Qualified SWPPP Practitioner (QSP). Our guide to QSD and QSP roles explains what each one does.

What is a WDID number?

A WDID is the number SMARTS issues when your coverage begins. On a construction site it must be posted where the public can see it, or be available on request.

How is a construction site’s risk level determined?

By combining sediment risk, calculated from rainfall erosivity, soil erodibility and slope, with receiving water risk, based on whether the site drains to a sediment-sensitive water body. SMARTS calculates the combined Risk Level 1, 2 or 3, and the level determines whether storm sampling is required.

How much does a SWPPP cost?

It depends on the site’s size and complexity, the permit, the Risk Level, and how much inspection and sampling you want handled. Tell us about the site and we will quote the scope before work starts.

Can you take over a SWPPP that someone else wrote?

Yes. Send us the current SWPPP and your SMARTS records. We will review them against the permit, list any gaps, and keep inspections, amendments and filings going from there.

Do you offer inspections without writing the SWPPP?

Yes. We can schedule and document the inspections your permit requires and coordinate sampling under an existing SWPPP.

Need a SWPPP or a second look at yours?

Tell us about the site and send any current SWPPP. We will confirm which permit applies and what it takes to stay covered.

Free tool

January 1 is closer than it looks

Validated water loss audits and annual water use reports are due January 1. The free deadline checker shows yours on screen.