Stormwater compliance
Stormwater Compliance Services for California Facilities, Sites, and Cities
SWPPPs, inspections, and SMARTS reporting by certified stormwater staff, kept current with the Industrial and Construction General Permits.
What we do
Stormwater compliance, start to finish
From the SWPPP to the annual report, we keep the documentation, inspections, and filings your permit requires.
SWPPP development and updates
Stormwater Pollution Prevention Plans prepared by our certified stormwater staff for construction sites under the Construction General Permit and for facilities under the Industrial General Permit, updated when site conditions or the permit change.
Inspections and monitoring
Scheduled site inspections, visual observations, and sampling coordination, with every check documented and kept on record.
SMARTS reporting
Notices of Intent, annual reports, and monitoring data filed in SMARTS, the State Water Board reporting system, on time.
MS4 program support
Annual reports, outfall mapping, standard operating procedures, and program documentation for cities and districts under municipal stormwater permits.
Agency coordination
Responses to State Water Board and Regional Board requests, notices, and inspections, with the documentation to back them up.
Compliance calendar
One calendar for inspections, sampling, training, and filing deadlines, so nothing in the permit is missed.
Which permit covers you
Industrial facilities
Industrial General Permit (Order 2014-0057-DWQ as amended, administratively continued): coverage by SIC code, a SWPPP, sampling, and an annual report certified in SMARTS by July 15. A QISP is required once a facility enters Level 1 status.
Construction sites
Construction General Permit (Order 2022-0057-DWQ), in effect since September 1, 2023: projects disturbing one acre or more, a SWPPP by a QSD, Risk Level 1, 2 or 3 monitoring by a QSP, and an annual report by September 1.
Cities and districts
Municipal (MS4) stormwater permits: program documentation, annual reporting, and outfall records.
Inspections
Commercial and industrial stormwater inspections in California
What the statewide permits require on site, and what we schedule and document for you. A commercial property outside the listed industrial categories may still have local requirements under its city or county municipal permit.
| Check | When | Permit section |
|---|---|---|
| Visual observations | At least once per calendar month, in each drainage area, in daylight and during operating hours | IGP Section XI.A |
| Sampling event observations | At the same time samples are collected | IGP Section XI.A |
| Storm sampling | Two Qualifying Storm Events from July 1 to December 31, and two from January 1 to June 30 | IGP Section XI.B |
| Annual Comprehensive Facility Compliance Evaluation | Once each reporting year, covering records, industrial areas, BMPs, and equipment | IGP Section XV |
| Construction site inspections | Weekly, before and during qualifying storms, and after storms of 0.5 inches or more | CGP Attachment D, III.C |
Construction
Construction stormwater compliance in California
Under the Construction General Permit, compliance starts before the first shovel and runs until the Notice of Termination.
Enrollment
Permit Registration Documents go into SMARTS before construction starts: the Notice of Intent with the Risk Level, site maps, the SWPPP and the annual fee. Coverage begins when SMARTS issues a WDID number.
Risk Level
Sediment risk and receiving water risk combine into Risk Level 1, 2 or 3. Risk Level 2 and 3 sites sample stormwater discharges for pH and turbidity.
Inspections
Weekly, within 72 hours before a qualifying storm forecast, every 24 hours during the event, and within 96 hours after one that measured 0.5 inches or more.
QSD and QSP visits
A QSP inspects monthly. A QSD visits within 30 days of construction starting and twice a year, once from August through October and once from January through March.
Need the plan itself? See our SWPPP services for California sites.
Industrial
Industrial stormwater compliance in California
Under the Industrial General Permit, a facility samples four qualifying storms a year, and results above the numeric action levels start a series of deadlines.
| Requirement | Deadline |
|---|---|
| Sampling results submitted in SMARTS | Within 30 days of obtaining all results |
| Level 1 Evaluation, with QISP assistance | October 1 after Level 1 status begins |
| Level 1 Exceedance Response Action Report | January 1 after Level 1 status begins |
| Level 2 Action Plan, if exceedances continue | January 1 after the reporting year of the exceedance |
| Annual Comprehensive Facility Compliance Evaluation | Once each reporting year |
| Annual report certified in SMARTS | July 15 |
The process
How it works
- Tell us your permit and site
- We review your SWPPP and records
- We close the gaps
- Inspections, sampling, and filings stay on schedule
Construction vs industrial
Construction General Permit vs Industrial General Permit
The two statewide permits most sites fall under, side by side.
| Requirement | Construction (Order 2022-0057-DWQ) | Industrial (Order 2014-0057-DWQ) |
|---|---|---|
| Who is covered | Soil disturbance of one acre or more, or less within a larger common plan of development | Industrial activity in a category listed in Attachment A, by SIC code |
| Who prepares the SWPPP | A Qualified SWPPP Developer (QSD) | The discharger; a QISP once the facility enters Level 1 status |
| Field implementation | A Qualified SWPPP Practitioner (QSP) | The facility, with a QISP for Exceedance Response Actions |
| Annual report in SMARTS | September 1 | July 15 |
| Ending coverage | Notice of Termination | Notice of Termination, or a No Exposure Certification if the facility qualifies |
Monitoring, risk levels and every deadline: SWPPP requirements in California.
FAQ
Questions about stormwater compliance
What does stormwater compliance require in California?
Most industrial facilities and construction sites that disturb one acre or more need coverage under a statewide general permit: the Industrial General Permit or the Construction General Permit. Coverage means a current SWPPP, the inspections and monitoring the permit requires, and reports filed in SMARTS. Cities and districts operate under municipal (MS4) permits with their own program and reporting requirements.
Who needs a SWPPP?
Every site covered by the Construction General Permit or the Industrial General Permit needs a Stormwater Pollution Prevention Plan. Under the Construction General Permit, the SWPPP is prepared by a Qualified SWPPP Developer (QSD) and carried out in the field by a Qualified SWPPP Practitioner (QSP). Exodus has certified stormwater staff who prepare SWPPPs and carry out the inspections and monitoring they require.
What is the difference between a QSD, a QSP and a QISP?
On construction sites, the QSD writes and amends the SWPPP and must be retained from the start of the project through Notice of Termination approval, while the QSP carries it out in the field with inspections and sampling. On industrial sites, a QISP is required once a facility enters Level 1 status after sampling exceeds a numeric action level; the QISP prepares the Level 1 Exceedance Response Action report, due in SMARTS by January 1 after Level 1 status begins.
Does a project under one acre need a SWPPP?
Usually not under the Construction General Permit, unless it is part of a larger common plan of development or sale that disturbs one acre or more. Your city or county may still require erosion and sediment controls under its own permit.
Is the Industrial General Permit still in effect?
Yes. Its term ended June 30, 2020, and the State Water Board states it is administratively continued under 40 CFR 122.6 until a new permit is issued, so Order 2014-0057-DWQ as amended remains the permit to follow.
When is the Industrial General Permit annual report due?
The annual report for each reporting year (July 1 to June 30) is certified in SMARTS no later than July 15. Construction General Permit annual reports are due September 1.
What changed with the 2022 Construction General Permit?
Order 2022-0057-DWQ took effect on September 1, 2023, and the 2009 permit was terminated on August 31, 2025. Projects that started under the 2009 permit had to transition to the 2022 requirements, including an updated SWPPP.
Do you inspect commercial and industrial sites?
Yes. We schedule and document the inspections and observations your permit requires, coordinate sampling, and keep the records ready for a Regional Board inspection.
Bring your stormwater program current
Tell us which permit you operate under and send your current SWPPP. We will map the gaps, the deadlines, and what it takes to close them.