SMARTS Account and WDID Number: How California Stormwater Registration Works
How to set up a SMARTS account (LRP, DAR, DEP), mail the eAuthorization form, get a WDID number, and keep it current when people or owners change.

Short answer: SMARTS is the State Water Board’s online system for stormwater permits, and a WDID (Waste Discharge Identification) number is the ID it issues once your permit coverage is in place. To get one, the person legally responsible for the business (the Legally Responsible Person, or LRP) creates an individual SMARTS account, mails a wet-ink eAuthorization form, and certifies the Permit Registration Documents in SMARTS. Construction can start only after the WDID is issued (Construction General Permit, Section III.A), and industrial facilities are assigned one once their documents are certified and the annual fee is received (Industrial General Permit, Section II.B).
Last reviewed November 15, 2026, against the State Water Board’s SMARTS help guides (revised March and April 2026), Construction General Permit Order 2022-0057-DWQ, and Industrial General Permit Order 2014-0057-DWQ as amended. Sources are listed at the end.
Most SMARTS problems are not about the permit itself. They come from the wrong person holding the account, a consultant set up in a role the system will not let them use, or an eAuthorization form that never reached Sacramento. This guide walks through the account roles, the registration steps, how a WDID is issued, and what to do when people or owners change.
What SMARTS and a WDID number are
SMARTS stands for the Stormwater Multiple Application and Report Tracking System. Dischargers, regulators, and the public use it to enter, manage, and view stormwater data, including Permit Registration Documents, compliance records, and monitoring data under California’s stormwater general permits. The State Water Board notes that SMARTS meets the U.S. EPA’s Cross-Media Electronic Reporting Rule (CROMERR), which is why your SMARTS login counts as a legal signature.
The WDID number is the identifier for your permit coverage. You use it on every later filing, and you quote it when you contact the State Water Board or a Regional Water Board.
| Item | What it is | Who has it |
|---|---|---|
| SMARTS user account | An individual login, tied to one person | Each LRP, DAR, and DEP has their own |
| Organization record | The business or agency that is the discharger | Created by an LRP; can hold many WDIDs |
| Application or WDID | One permit coverage for one site or facility | Linked to an organization |
| eAuthorization form | A signed, wet-ink form that turns on certification rights | One per LRP or DAR, per organization |
| Secret Code Number (SCN) | A code from the Help Desk used to claim existing records | Used when replacing an LRP |
The three SMARTS account roles
SMARTS has three user roles. Picking the right one at sign-up matters, because a role is fixed to the account that created it.
| Role | Can certify and submit | Can link other users | Who usually holds it |
|---|---|---|---|
| Legally Responsible Person (LRP) | Yes, including Permit Registration Documents | LRPs, DARs, and DEPs | A corporate officer, owner, or senior public official |
| Duly Authorized Representative (DAR) | Yes, for documents other than Permit Registration Documents | DEPs only | A site manager, superintendent, or environmental manager employed by the discharger |
| Data Entry Person (DEP) | No. Can enter and save data only | No one | Staff, consultants, or labs who prepare filings |
Who can be the LRP. The Industrial General Permit sets the rule (Section XXI.K.4). For a corporation, it is a responsible corporate officer, such as a president, secretary, treasurer, or a vice president in charge of a principal business function, or a facility manager with authority over environmental compliance. For a partnership or sole proprietorship, it is a general partner or the owner. For a public agency, it is a principal executive officer or ranking elected official.
Who can be a DAR. The DAR must be authorized through SMARTS and must have responsibility for the overall operation of the facility or activity, such as a manager, operator, or superintendent, or overall responsibility for environmental matters for the company (IGP Section XXI.K.5). The State Water Board’s April 2026 linking guide adds that a DAR role may not be delegated to a third party. If a person’s email domain does not match the organization, SMARTS stops the linking, and an employee with a different domain has to contact the Stormwater Help Desk.
Where a consultant fits. An outside stormwater consultant normally works as a Data Entry Person. The consultant can prepare and upload the Notice of Intent, the SWPPP, and reports, and the LRP or DAR then reviews and certifies them. Under both permits, only the LRP certifies the Permit Registration Documents (IGP Sections II.A.1 and XXI.K.1; CGP Section VI.H).
Other limits worth knowing:
- Each organization can have up to three LRPs. The first LRP can link up to two more.
- Only an LRP can create a new organization record. A DAR or DEP can only start applications under an organization they are already linked to.
- Documents certified by an unauthorized or ineligible LRP or DAR are invalid (IGP Section XXI.K.3).
How to set up a SMARTS account, step by step
These steps follow the State Water Board’s LRP registration guide (revised March 2026). The DAR and DEP guide uses the same screens, without the organization step.
- Go to smarts.waterboards.ca.gov and select “Create Account.” The Water Board recommends Google Chrome or Microsoft Edge, since other browsers may cause errors.
- Choose the account type (LRP, DAR, or DEP) and read the role description before you continue.
- Enter your account details. The account must belong to one named person, not a shared office login.
- Pick a user ID and security answers. The user ID is case and space sensitive. You answer five security questions and set a Personal Identification Code (PIC).
- Tell SMARTS why you are registering (LRP only). If the organization already has, or had, permit coverage and you are replacing the existing LRP, choose “Yes” and follow the replacement steps later in this guide. If not, create a new organization record with its name, address, business type, and tax details.
- Certify and finish. Enter the security image letters and check the certification boxes.
- Log in with the temporary password. SMARTS emails a temporary password that is valid for 72 hours. Log in and set a new one.
- Print, sign, and mail the eAuthorization form (LRPs and DARs). See the next section.
- Link your team. From “Account Management,” choose “Manage Linked Users,” search for each person by last name and email, choose the organization and role, and link one application, several, or all of them.
Data Entry Persons can be limited to specific WDIDs. LRPs and DARs are linked to all future applications for the organization automatically.
The eAuthorization form: the step people skip
The eAuthorization form is a signed statement that your SMARTS login is your electronic signature and that you will not share it. Under the April 2026 guide:
- One form is required for each LRP or DAR, for each organization record.
- It needs an original wet-ink signature. A scan or e-signature does not count.
- The State Water Board must receive it before you can certify applications, reports, Changes of Information, or Notices of Termination.
- Download it in SMARTS under “Account Management,” then “Update Organization Name/Address.” If no link appears, your form has already been received.
- Mail it to SWRCB, Attn: Stormwater Help Desk, PO Box 1977, Sacramento, CA 95812-1977. For overnight delivery, use 1001 I Street, 15th Floor, Sacramento, CA 95814.
- You get an email once your account is updated to allow online certification.
The Construction General Permit also says dischargers need a signed original eAuthorization form on file for each organization in SMARTS (CGP Section III.A, footnote 6). Plan for mailing time. A project that is ready to file but has no processed eAuthorization cannot certify anything.
How you get a WDID number
Construction sites (Construction General Permit)
Under CGP Section III.A.1, the discharger gets a WDID before construction starts by certifying and submitting these Permit Registration Documents in SMARTS:
- A Notice of Intent, including the Risk Level determination.
- Site drawings and maps.
- The SWPPP.
- Any plans and calculations needed to show compliance with post-construction requirements.
- The annual fee, under the current fee schedule in Title 23 of the California Code of Regulations.
- Any other information required by Attachment D.2.
Coverage begins, and construction may begin, when SMARTS generates the WDID number (Section III.A.2). In a public emergency, the discharger describes the emergency work to the Regional Water Board within five calendar days of starting and submits the full documents within 30 calendar days (Section III.A.3).
Post the WDID. The site-specific WDID must be posted where the public can see it, or be readily available on request if public posting is not possible (Section III.A.2). The Qualified SWPPP Practitioner verifies that the SMARTS WDID notification form is posted, kept up to date, and shows start and end dates that match SMARTS (Section V.D).
Industrial facilities (Industrial General Permit)
The LRP certifies and submits the Permit Registration Documents for Notice of Intent or No Exposure Certification coverage (IGP Section II.A.1). The State Water Board assigns the WDID once the documents are certified and submitted and the annual fee is received (Section II.B). New facilities registering for a No Exposure Certification file at least seven days before industrial activities begin (Section II.B.2.b).
What happens when people or owners change
| Change | What SMARTS and the permits require |
|---|---|
| A DAR or DEP leaves | The LRP (or a DAR, for DEPs) delinks them in “Manage Linked Users” |
| A new DAR is designated | Link them in SMARTS, and they mail their own eAuthorization form |
| The LRP leaves the company | Replace the LRP through the Stormwater Help Desk (steps below) |
| Contact details change (construction) | Keep contacts current; a QSP verifies they are updated within 90 days of a change (CGP Section V.D) |
| The site or facility is sold | Coverage does not transfer; the new owner needs a new WDID |
Replacing an LRP. Per the April 2026 guide, email the Stormwater Help Desk with the previous LRP’s name or the affected application or WDID numbers, and the reason for the change. The Help Desk sends instructions, the Organization ID, and a Secret Code Number. The new LRP creates an account (or asks the Help Desk to upgrade an existing DAR or DEP account), chooses “Replace LRP,” and enters the codes. The new LRP must claim all applications and WDIDs under that organization, not just one. Then they print, sign, and mail a new eAuthorization form.
Selling a construction site. Before the sale, the existing discharger files a Notice of Termination for change of ownership in SMARTS, with the new owner’s name, address, phone number, and email, and certifies that the new owner was told about the permit requirements (CGP Section III.F.5.a). Coverage is not transferable. The new owner files its own documents and gets a new WDID before continuing work, and enters the original project start date (Section III.F.5.b).
Selling or moving an industrial facility. IGP coverage is also non-transferable. New documents must be certified and submitted before the transfer, or at least seven days before the first day of operations for a relocated facility (IGP Section XXI.R). The old discharger files a Notice of Termination, and stays responsible for compliance and fees until a valid one is received (Section II.C.1).
Keeping your WDID in good standing
- Annual reports. Construction dischargers file an annual report in SMARTS by September 1 for July 1 to June 30, if the WDID was active for at least 90 days in that period (CGP Section IV.P.1). Industrial dischargers file no later than July 15 after each reporting year (IGP Section XVI).
- Protect the login. By certifying, you agree not to share your electronic signature. Under the Construction General Permit certification, any delegation is made formally in writing and reported in SMARTS within 10 days. A lost or stolen signature is reported to the State Water Board within two business days (CGP Section VI.H).
- Keep records current. Construction dischargers keep project data and contact information current in SMARTS, and update the LRP’s details if the LRP changes (CGP Sections V.A.5 and V.A.6).
Common mistakes we see
- One shared login for the office. Each account must belong to one person, and the login is that person’s signature.
- The consultant registered as a DAR. SMARTS will not link a third party as a DAR. Register consultants as Data Entry Persons.
- eAuthorization never mailed. Without it, the LRP or DAR cannot certify, and a construction start date slips.
- A new organization record for every site. One organization can hold many WDIDs. Extra organization records mean extra eAuthorization forms and more linking work.
- Assuming a WDID comes with the property. Buyers of construction sites and industrial facilities need their own coverage.
- An LRP who left years ago. Replace the LRP as soon as the person leaves, before the next annual report is due.
Southern California: which Regional Water Board you will deal with
SMARTS is statewide, but enforcement and site questions go to your Regional Water Board.
- Ventura County and Los Angeles County. The Los Angeles Regional Water Quality Control Board (Region 4) covers the coastal watersheds of Los Angeles and Ventura Counties, which takes in Thousand Oaks, Simi Valley, Camarillo, Oxnard, and Ventura.
- San Bernardino County. Confirm which Regional Water Board covers your site on the State Water Board’s regional board map before you call, since the answer depends on the watershed.
Whichever board you work with, the WDID is the reference number for every question you ask, so have it ready.
How Exodus helps
Exodus Water Services, based in Thousand Oaks, provides stormwater compliance services for construction sites and industrial facilities, with certified stormwater staff who prepare SWPPPs and handle SMARTS filings. A typical setup keeps your LRP and DAR in control of certification, while our staff are linked as Data Entry Persons to prepare the Notice of Intent, upload the SWPPP, and keep the annual report on schedule. See our SWPPP services, or use the County Coverage Finder to see what we cover in your county. Call (805) 991-7333 or request a stormwater review.
Frequently asked questions
What is a WDID number? A Waste Discharge Identification number. It is the ID the State Water Board issues through SMARTS once your stormwater permit coverage is in place, and you use it on every later filing and inquiry.
How do I get a WDID number for a construction site? The Legally Responsible Person certifies and submits the Notice of Intent, site maps, SWPPP, post-construction documents, and the annual fee in SMARTS. Coverage begins when SMARTS generates the WDID, and construction cannot start before then (CGP Section III.A).
Can my stormwater consultant be the LRP or DAR? No. The LRP is a company officer, owner, or senior public official, and a DAR must be an employee responsible for the facility or its environmental matters. The State Water Board’s linking guide says a DAR role may not be delegated to a third party. Consultants are linked as Data Entry Persons.
How long is the SMARTS temporary password valid? 72 hours, according to the State Water Board’s March 2026 registration guides. Log in and set a new password within that window.
Do I need a new eAuthorization form for each site? No. You need one eAuthorization form for each LRP or DAR, for each organization record. One organization can hold many WDIDs, so a single form can cover several sites.
What happens to the WDID when I sell my property? It does not transfer. The seller files a Notice of Termination in SMARTS, and the buyer files its own documents and receives a new WDID before continuing construction or operations.
How do I replace an LRP who left the company? Email the Stormwater Help Desk at stormwater@waterboards.ca.gov with the previous LRP’s name or WDID numbers and the reason. The Help Desk sends a Secret Code Number and Organization ID, which the new LRP uses under “Replace LRP” in SMARTS.
Who do I call with a SMARTS problem? The State Water Board’s Stormwater Help Desk, at 1-866-563-3107 or stormwater@waterboards.ca.gov.
Sources
- State Water Board, SMARTS resources
- State Water Board, LRP user registration guide, revised March 2026 (PDF)
- State Water Board, DAR and DEP user registration guide, revised March 2026 (PDF)
- State Water Board, Managing and linking users guide, revised April 2026 (PDF)
- State Water Board, Electronic Authorization form guide, revised April 2026 (PDF)
- State Water Board, Replacing a Legally Responsible Person guide, revised April 2026 (PDF)
- State Water Board, Creating a new construction application in SMARTS, September 2023 (PDF)
- State Water Board, Construction General Permit, Order WQ 2022-0057-DWQ (PDF): Sections III.A, III.F.5, IV.P, V.A, V.D, and VI.H
- State Water Board, Industrial General Permit, Order 2014-0057-DWQ as amended (PDF): Sections II.A, II.B, II.C, XVI, and XXI.K and XXI.R
- Los Angeles Regional Water Quality Control Board, About us