2025 UWMP and Water Shortage Contingency Plan Guide for California
What California's Water Code requires in a 2025 Urban Water Management Plan and Water Shortage Contingency Plan: who files, deadlines, six shortage levels.
Short answer: Every California urban water supplier, meaning one that serves more than 3,000 customers or supplies more than 3,000 acre-feet a year, must prepare an Urban Water Management Plan (UWMP) at least every five years (Water Code 10617 and 10621). The 2025 plans were due to the Department of Water Resources (DWR) by July 1, 2026, and the next round, the 2030 plans, is due July 1, 2031. Each UWMP includes a Water Shortage Contingency Plan (WSCP) with six standard shortage levels, and the supplier must file an annual water supply and demand assessment by July 1 every year in between (Water Code 10632 and 10632.1).
The UWMP is often treated as a document you write once every five years. With the annual assessment, it is closer to a standing program: the plan sets the method, and each spring you run it again with the current year’s supply and demand.
Who has to prepare a UWMP
Water Code section 10617 defines an urban water supplier as a public or private supplier that provides water for municipal purposes, directly or indirectly, to more than 3,000 customers or supplies more than 3,000 acre-feet of water a year. Both retail suppliers (who sell to end users) and wholesale suppliers can qualify.
If your system is near either threshold, check both numbers every year. Growth can make a supplier “urban” between plan cycles.
Key deadlines
| Deadline | What is due | Water Code |
|---|---|---|
| At least every five years, on or before July 1 in years ending in 6 and 1 | Updated UWMP to DWR | 10621(a) |
| July 1, 2026 | 2025 UWMP | 10621(a) |
| July 1, 2031 | 2030 UWMP | 10621(a) |
| Within 30 days of adoption | Copies of the adopted plan to DWR, the California State Library, and each city and county the supplier serves, submitted electronically | 10644(a) |
| Within 30 days of adopting a revised WSCP | The revised WSCP to DWR | 10644(b) |
| July 1 every year | Annual water supply and demand assessment and annual water shortage assessment report to DWR | 10632.1 |
Suppliers that import from the State Water Project or the federal Central Valley Project have a different annual date: within 14 days of receiving final allocations, or by July 1, whichever is later (10632.1).
What the reliability assessment covers
The UWMP’s core is a supply reliability assessment. Section 10635 requires the plan to compare supply and demand over 20 years in five-year increments for three conditions:
- a normal water year;
- a single dry year; and
- a drought lasting five consecutive years.
The plan also includes a drought risk assessment that looks at the next five years as if they were a five-year drought. If that assessment shows a shortfall, the WSCP is where the response lives.
The Water Shortage Contingency Plan
The WSCP is a required part of the UWMP (Water Code 10632). It is the operating plan for a shortage: how you decide a shortage exists, what level it is, and what you do at each level.
The six standard shortage levels
Every WSCP must use six standard water shortage levels, tied to the percentage shortage in supply:
| Level | Shortage in supply |
|---|---|
| 1 | Up to 10 percent |
| 2 | Up to 20 percent |
| 3 | Up to 30 percent |
| 4 | Up to 40 percent |
| 5 | Up to 50 percent |
| 6 | More than 50 percent |
A supplier whose existing plan uses different levels may keep them if it includes a cross-reference relating its levels to the six standard levels (10632(a)(3)(B)). The levels also apply to catastrophic interruptions of supply, such as a regional power outage, an earthquake, or another emergency.
What a WSCP must contain
Section 10632(a) lists the required elements. In plain terms:
- Water supply reliability analysis. The key findings from the UWMP’s reliability assessment.
- Annual assessment procedures. The written decision-making process the supplier uses each year to determine its supply reliability, plus the key data inputs and method: current year unconstrained demand, current year available supply considering one dry year, infrastructure constraints, and a consistent set of evaluation criteria.
- The six shortage levels, as above.
- Shortage response actions for each level: supply augmentation, demand reduction, operational changes, and additional mandatory prohibitions, with an estimate of how much each action closes the gap.
- Communication protocols for customers, the public, and interested parties, including how and when shortage levels and actions are announced.
- Compliance and enforcement procedures, including how customers can appeal or seek exemptions (for retail suppliers).
- Legal authorities the supplier relies on to declare a shortage and enforce its actions.
- Financial consequences of drought conditions and the supplier’s responses, including the revenue impact of lower sales.
- Monitoring and reporting procedures that track customer compliance and support state reporting (for retail suppliers).
- Reevaluation and improvement procedures for testing whether the plan still works.
The WSCP can be revised between UWMP cycles. A revised WSCP goes to DWR within 30 days of adoption (10644(b)).
The annual water supply and demand assessment
This is the part that turns the UWMP into a yearly obligation. By July 1 each year, an urban water supplier runs the assessment procedures in its WSCP and files an annual water shortage assessment report with DWR (10632.1). The assessment compares this year’s unconstrained demand against available supply for the current year and one dry year, and decides whether the supplier needs to enter a shortage level.
In practice this means pulling current supply data from each source, wholesaler allocations, groundwater conditions, and demand from the past year. Utilities that keep monthly production and delivery data in one place, the same data that feeds the SAFER Clearinghouse reports and the eAR, find this assessment far easier.
Common problems
- The WSCP is copied from the last plan. Response actions written for an older supply mix may not fit today, and their estimated savings are often never checked.
- No one owns the July 1 assessment. The plan names a process, but nobody is assigned to run it each spring.
- Data does not reconcile. Production in the UWMP, the eAR, the SAFER reports, and the water loss audit should tell the same story. When they do not, reviewers notice.
- Financial consequences are an afterthought. A Level 3 shortage cuts sales, and the plan has to say how the supplier stays solvent.
- Customers learn about a shortage too late. Communication protocols exist on paper but not in a ready-to-send form.
Frequently asked questions
When was the 2025 UWMP due? On or before July 1, 2026. Water Code 10621(a) requires an update at least every five years, on or before July 1 in years ending in six and one.
When is the next UWMP due? The 2030 UWMP is due on or before July 1, 2031.
How many shortage levels does a WSCP need? Six standard levels: up to 10, 20, 30, 40, and 50 percent, and more than 50 percent shortage in supply (Water Code 10632). A supplier with different existing levels may keep them with a cross-reference to the six standard levels.
Is the annual water supply and demand assessment required every year? Yes. Urban water suppliers file the annual water shortage assessment report with DWR by July 1 each year, or for State Water Project and Central Valley Project importers, within 14 days of final allocations if that is later (Water Code 10632.1).
Does a revised WSCP have to go to DWR? Yes. A supplier that revises its WSCP submits the revised plan to DWR within 30 days of adoption (Water Code 10644(b)).
Who qualifies as an urban water supplier? A supplier serving more than 3,000 customers or supplying more than 3,000 acre-feet a year for municipal purposes (Water Code 10617).
How Exodus helps
Exodus Water Services prepares UWMPs and WSCPs for California urban water suppliers, runs the annual water supply and demand assessment each spring, and keeps the data behind it consistent with the water loss audit, eAR, and SAFER filings. See UWMP and WSCP services, our California water system compliance guide, or contact us to review your plan before next July.
Last reviewed: November 6, 2026.
Sources
- California Legislative Information, Water Code section 10617 (urban water supplier definition)
- California Legislative Information, Water Code section 10621 (five-year update schedule)
- California Legislative Information, Water Code section 10632 (Water Shortage Contingency Plan)
- California Legislative Information, Water Code section 10632.1 (annual assessment)
- California Legislative Information, Water Code section 10635 (reliability and drought risk assessment)
- California Legislative Information, Water Code section 10644 (submittal of plans)